Pile Setting Out in Liverpool and the North West
Pile positions set out from the piling layout, offset pegs on the piling mat, checks before each pile goes in and as built pile surveys after, for piling contractors, groundworkers and main contractors across the North West.
Every pile in the right place, and proved
Pile setting out puts each pile at the position and level on the piling layout, so the pile caps, ground beams and the building above line up. A pile in the wrong place is expensive to fix once it is in the ground, so the positions need to be right before the rig arrives and checked after it leaves.
We number every pile and schedule its coordinates from the piling layout before we arrive, set the positions out from the site control and record what was built. The same engineer can stay with the job through piling, pile caps and ground beams.
- Bearing piles, sheet pile walls and marine piles
- Calibrated Leica robotic total stations, with Leica GPS on open sites
- As built pile schedules sent the same day
How we set out piles
Before the rig arrives
We check the site control and temporary benchmarks, or set them up if there are none, tied to the Ordnance Survey grid or your site grid. Then we build the pile schedule from the piling layout: pile numbers, coordinates and levels, checked against the gridlines on the general arrangement.
We agree the tolerance and how you want the results with the piling contractor and the engineer before we start. Most jobs follow the tolerance in the project specification, often the ICE Specification for Piling and Embedded Retaining Walls.
On the piling mat
Each pile position is marked with a pin or peg, with offset pegs set clear of the rig so the position can be put back if the mat moves or a peg is knocked out. We check the position again just before the pile goes in, because a tracking rig moves the mat.
Where the piles are close together or the mat is busy, we set out in batches to suit the rig, so the piling crew always has the next piles ready.
After installation
We survey each pile’s as built position, and its cut off level once the piles are trimmed, then send an as built schedule showing how far each pile is from its design position. Any pile out of tolerance is known before the pile caps are dug, while there is still time to redesign the cap.
Sheet piles and marine piles
For sheet pile walls we set out the line of the wall and check it as the piles go in. Over water there is nothing to put a peg in, so positions are controlled with the instrument from a fixed control network on the shore, as we did for the two marine monopiles at Woodside Ferry Terminal.
A typical piling day
- Check the control: a known point and a temporary benchmark checked before anything is set out.
- Set out the day’s piles: the positions the piling foreman needs first, each with its offsets.
- Check before each pile: the position put back or confirmed just before the rig drills or drives.
- Record the as builts: each finished pile surveyed and logged against its number.
- Send the results: the as built schedule and any deviations sent to the piling contractor and engineer the same day.
Who we work for
- Piling contractors who want an engineer on the mat without taking one on full time.
- Groundworkers setting out the pile caps and ground beams that follow.
- Main contractors and developers who need an independent check of the piles before the caps go in.
What to send for a quote
The piling layout and general arrangement as PDF or DWG, any site control, the number of piles, the tolerance in your specification and the piling dates. We send a clear price, usually the same day.
Recent piling jobs
Woodside Ferry Terminal
Birkenhead: setting out for two 2.1 m rock socketed monopiles, installed from a jack-up barge in the River Mersey. Read the case study.
Villa Park stand rebuild
Birmingham: groundworks for the stand rebuild, including piling, pile caps, retaining beams and drainage.
Deeside Tissue Factory
Flintshire: large industrial slabs, retaining walls and piling works.
Netherton
Sefton: site engineering for foundations, piling mats, steel, brickwork and external works.
Macclesfield housing
A timber frame housing estate: foundations, piles and pile cages, drainage and roads.
Alum Rock and Aston
Birmingham: setting out for sheet pile walling, cut and fill and foundations on two new builds.
Most of our piling work is in Liverpool and Merseyside, Greater Manchester, Lancashire and Cheshire, with jobs UK wide through our network of trusted partners. See all our projects on the map.
Pile setting out: common questions
What do you need from us to set out piles?
The piling layout with pile numbers and coordinates or gridlines, the general arrangement, any existing site control, the tolerance in your specification and the dates. If there is no site control we set it up first.
Can you set out piles on the piling mat?
Yes. We set out from the site control, from the piling mat where there is one, and leave offset pegs clear of the rig so each position can be put back if the mat moves or a peg is lost.
Do you survey the as built pile positions?
Yes. After installation we record each pile’s as built position, and the cut off level once the piles are trimmed, so any pile out of position is known before the pile caps are dug.
Do you set out marine and sheet piles?
Yes. At Woodside Ferry Terminal we set out two 2.1 m rock socketed monopiles in the River Mersey from control on the river wall, and we have set out sheet pile walling at Alum Rock and Aston in Birmingham.
How much does pile setting out cost?
A half day is £300 + VAT and a full day is £400 to £600 + VAT, depending on availability, complexity and the roles required, with a calibrated Leica total station included. Travel is added for sites further from Liverpool. See our prices.
Related services
Got piles to set out?
Send the piling layout and your dates and we’ll come back with availability and a price, usually the same day.