Woodside Ferry Terminal: setting out marine piles on the Mersey

Setting out for two 2.1 metre rock-socketed monopiles at the new Woodside Ferry Terminal in Birkenhead, installed from a jack-up barge in the River Mersey through the winter of 2024.

Leica total station on the river wall at Woodside at sunrise, with the piling barge in the River Mersey and the Liverpool skyline
Case study

A new ferry terminal on the Wirral waterfront

Woodside in Birkenhead is the Wirral terminal for the Mersey Ferries, looking straight across the river to Liverpool’s waterfront. The new terminal needed two large monopiles, each 2.1 metres in diameter and socketed into the rock below the riverbed, installed from a jack-up barge standing in the river.

We provided the site engineering for the piling, setting out the pile positions for the team on the barge.

Location
Woodside, Birkenhead, Wirral
Our role
Setting out for marine piling
Piles
Two 2.1 m rock-socketed monopiles
On site
December 2024 to January 2025
Setting out over water

Nowhere to put a peg in

On land, a setting out engineer marks positions with pegs, nails and paint. On open water there is nothing to mark, so pile positions have to be measured and controlled with the instrument instead.

Our engineer worked from survey control on the river wall at Woodside with a calibrated Leica robotic total station, with a clear line of sight across the water to the piling barge.

It is the same approach we use for commercial setting out on land: an accurate control network first, then every position measured from it and checked.

Leica robotic total station on a tripod on the Woodside river wall, with the jack-up piling barge and a tug on the Mersey
Our total station on the river wall, with the jack-up barge and its tug out on the Mersey.
Winter on the river

Early starts and short days

The work ran from December into January, with early starts in the dark and the short winter daylight to work with. Wind, weather and the tide all affect work on the river, so the setting out had to fit around the piling on every shift.

Panorama at first light from the Woodside river wall: total station, the piling barge on the Mersey and Liverpool’s waterfront skyline
First light over the Mersey: our kit on the river wall at Woodside, the piling barge in the river and Liverpool’s waterfront beyond.
What this job shows

Accurate setting out, wherever the job is

  • Away from dry land: positions set out over water from a fixed control network on the shore.
  • Specialist teams: we fit in alongside piling, marine and steel contractors and work to their programme.
  • Calibrated Leica kit: robotic total stations and GNSS, checked and in calibration.
  • Any conditions: dark mornings, winter weather and live sites are part of the job.

Related services

Got a piling, marine or complex setting out job?

Tell us about the site and the programme and we’ll come back with a clear quote, usually the same day.