Commercial Setting Out in the North West
Setting out and site engineering for main contractors, steel, precast and piling contractors and developers: gridlines, piles, steel frame and drainage, with QA records and as-built surveys, from our base in Liverpool across the North West and UK wide.
Precision setting out for major projects
LL Engineering Group is a Liverpool setting out company providing setting out and site engineering to main contractors, steel, precast and piling contractors and developers. From establishing the site control network to setting out piling, foundations, steel frame and drainage, we keep your project dimensionally accurate and fully documented.
Since 2017 we have worked on over 100 projects for more than 50 contractors, from stadium expansions and steel frame warehouses to piled foundations and marine piling, and we can supply engineers to your programme, with or without kit.
Site engineering support, end to end
Gridline Establishment
Primary and secondary control and gridlines set out and maintained across the site.
Foundation & Pile Setting Out
Pile positions, pile caps, pads and ground beams set out to tight tolerances.
Steel Frame Setting Out
Column gridlines and holding-down bolt positions set out ready for steel erection.
Drainage & Services
Deep and shallow drainage, invert levels, ducts and service routes set out accurately.
QA Checks
Independent verification surveys and dimensional control with documented QA records.
As-Built Surveys
As-built and verification surveys with CAD deliverables for your records and handover.
Steel frame, precast and pile setting out
Steel frame contractors
We set out column gridlines and holding-down bolts before the bases are poured, and check the bolts again after the pour. Once the frame is up, we survey each column for position, level and plumb against the National Structural Steelwork Specification, and our own AutoCAD add-in, LL Tools, marks each one OK or non-conform, with the results back to you the same day.
Precast contractors
Precast goes in quickly, so positions and levels need to be ready before the crane arrives. We set out column, wall and beam positions and bearing levels from the site control, then check the units as they are placed. Jobs include Shotton Paper Mill, a multi storey car park at North Manchester General and the terracing for the new stadium at Bramley-Moore Dock.
Piling contractors
Every pile is numbered and its coordinates scheduled from the piling layout before we arrive, then set out from the site control, from the piling mat where there is one. After installation we record each pile’s as-built position, so any pile out of position is known before the pile caps are dug. Our piling work includes the Deeside Tissue Factory, the Villa Park stand rebuild and two 2.1 m marine monopiles at Woodside Ferry Terminal. See how a piling job runs on our pile setting out page.
Main contractors and developers
We start with a control network and temporary benchmarks, tied to the Ordnance Survey grid or your site grid, so every trade works from the same points and heights. Then we can cover the whole job: gridlines, foundations, drainage and external works, checks before each pour, daily records for your QA file and as-builts for handover.
What commercial setting out costs
A half day is £300 + VAT and a full day is £400 to £600 + VAT, depending on availability, complexity and the roles required, with a calibrated Leica total station included. Longer bookings get a reduced day rate, and travel is added for sites further from our base in Crosby, Liverpool. See our setting out and survey prices.
Every day is logged on our own timesheet system and signed off on site, so the invoice matches what was agreed. Weighing up employing your own engineer? Read what a setting out engineer really costs.
Our founder, Laurence Latham, is an MEng civil engineer with over 12 years of setting out, backed by an office team with 25 years’ combined site experience.
What to send for a quote
- Drawings: PDF or DWG, ideally the general arrangement, piling layout or steel drawings, with gridlines and coordinates.
- Site control: any existing control stations or site grid. If there are none, we set them up.
- Scope and programme: what needs setting out, checking or surveying, the tolerances in your specification and the dates you need.
We send a clear price, usually the same day, and nothing is booked until you agree it in writing.
Recent commercial setting out jobs
Most of our commercial work is in Liverpool and Merseyside, Greater Manchester and the rest of the North West, with jobs UK wide through our network of trusted partners.
Steel frame warehouse, Eccles
Salford: full engineering for a new steel frame warehouse, its yard slabs, retaining walls and drainage.
Atlantic Park, Bootle
Sefton: setting out for several steel frame warehouse units.
Mossley Hill Hospital
Liverpool: a complex job covering ground beams, precast, drainage and structures.
Factory extension, Wakefield
An extension to a large soft drinks factory, built while the plant stayed in production.
4 North, Edinburgh
New steel frame storeys added to a large office, with surveying, setting out and steel erection support.
Manchester Airport staff car park
A large cut and fill exercise, land drains and permeable drainage, then levelling for the surfacing.
We have also checked steel frame line and level at Edge Lane Retail Park in Liverpool, Huyton, an 80,000 sq ft unit at Altham, Durham, Rotherham, Redhill and Billingshurst.
Proven on demanding sites






Supply at all levels, with or without kit
We can place experienced setting-out and site engineers directly with your team, long or short term, with full back-office and instrument support.
Commercial setting out: common questions
Can you supply engineers to our programme?
Yes, we supply experienced site engineers at all levels, with or without instruments, on a long- or short-term basis. See our site engineering service for details.
Do you provide QA records and as-builts?
Absolutely. We provide dimensional control checks, documented QA records and as-built / verification surveys with CAD deliverables for handover.
What instruments do you use?
Calibrated Leica TS16 robotic total stations, Leica GPS and a Leica RTC360 laser scanner, available at short notice, selected to suit the tolerance and environment of each task.
Will you work as part of the principal contractor’s team?
Yes. We integrate with your site team and methods, attend inductions, and work to your QA, programme and health-and-safety requirements.
How much does commercial setting out cost?
A half day is £300 plus VAT and a full day is £400 to £600 plus VAT, depending on availability, complexity and the roles required. A calibrated Leica total station is included, longer bookings get a reduced day rate, and travel is added for sites further from Liverpool. See our prices.
Do you work outside the North West?
Yes. We work UK wide through our network of trusted partners, with commercial jobs from Edinburgh to Kent. Travel is added and shown in your quote. See where we have worked.
Do your engineers hold CSCS, SMSTS and SSSTS?
Every engineer holds a CSCS card, and we provide engineers with SMSTS, SSSTS and first aid where the site requires them. We hold public liability and professional indemnity insurance. Send your induction and competency requirements with the enquiry.
Related services
Let’s talk through your project
Send your drawings, programme or tender details and we’ll respond with availability and a price.