Full engineering support for the groundworks on a large restaurant extension in Southport: setting out every foundation element, checking it before the concrete went in and keeping the records, for a contractor without its own engineer.

New steel frame and timber joists for the restaurant extension in Southport, built on the new ground floor slab beside the existing building
Case study

A fit-out contractor that needed an engineer

The main contractor on this restaurant extension was a fit-out specialist, so it brought us in to provide all the engineering support for the groundworks. That meant setting out every element, checking it before the concrete was poured and keeping a record of what was built.

It was the very first job for LL Engineering Group, in 2017, and it is still a good example of the work we do today for builders and contractors who don’t have their own engineer.

Location
Southport, Merseyside
Our role
Groundworks setting out, checking and quality control
Foundations
Pile caps, ground beams and ground floor slab
When
Autumn 2017
Step by step

From paint marks to steel frame

How the foundations for the extension came together, photographed on site as the work went on.

  1. Ground beams and pile caps for the Southport extension marked out in blue and yellow paint on the broken out slab

    Setting out

    Ground beams and pile caps marked out in paint on the broken out slab, ready for digging.

  2. Ground beam reinforcement cages in orange formwork beside the existing building in Southport

    Reinforcement

    Ground beam cages in place in the formwork, checked against the setting out before the pour.

  3. Freshly cast concrete ground beams in their formwork, with an excavator behind

    Ground beams cast

    The finished beams in place, ready for the ground floor slab.

  4. Panorama of the finished ground floor slab and new blockwork beside the existing building

    Slab and blockwork

    The ground floor slab down and blockwork going up beside the existing building.

  5. Steel frame and timber joists going up on the new slab

    Steel frame

    The new steel frame and timber joists going up on the finished slab.

Why bring in an engineer

Get the foundations right first time

  • Everything in the right place: foundations set out to the drawings, so the frame and fit-out that follow go in without surprises.
  • Checks before every pour: errors are found while they are still cheap to put right, not after the concrete is in.
  • A record of what was built: for the client, the design team and the trades that come next.
  • No engineer on your books needed: bring us in for the groundworks stage, or for the whole job.

Related services

Need your foundations set out and checked?

Send us your drawings or a few details and we’ll come back with a clear quote, usually the same day.