Do I need a topographical survey for planning permission?
What Liverpool and Wirral councils actually ask for, when a survey is worth it, and what to ask your surveyor for.
The short answer
Often, yes, but it depends on your council and your project. In Liverpool, plans for any extension or new build must show existing and proposed ground levels. In Wirral, new buildings and sites with a level change of a metre or more need a site levels plan, and a topographical survey is accepted as that plan. For a small extension on flat ground your architect may manage without one, but on a sloping site, near trees or for a new house, a topographical survey is usually the simplest way to give the planners what they ask for.
What is a topographical survey?
A topographical survey is an accurate scale drawing of your site as it is today: the levels and shape of the ground, and everything on it, from boundaries and buildings to trees, drainage covers and steps. The levels are measured as heights above Ordnance Datum (roughly, height above sea level), so your architect can design the new building to the real ground and the planners can see exactly how it will sit.
Why planners ask for levels
Planning officers need to judge how a new building will affect its surroundings. Without levels they cannot tell how tall an extension will really look from next door, whether a new house will overlook its neighbours, how much ground will be dug out or built up, or how water will drain away. On a flat plot this is easy to show on ordinary drawings. On a sloping site, or where the ground is being changed, it is not, and that is where the survey comes in.
What Liverpool City Council asks for
Liverpool’s validation guidance for planning applications (last updated October 2025) sets out what plans must show. The points that matter for levels are:
- Extensions and new builds: existing and proposed ground levels should always be shown.
- Changes to ground levels: sections must show existing and proposed floor and ground levels, measured from a fixed datum point off the site.
- Sloping sites: full level information is needed to show how the proposal sits within the site and against neighbouring buildings.
- Rear extensions and conservatories: drawings should show the boundary walls and, where relevant, the levels of the neighbouring properties.
- Trees: a tree survey plan must be based on a topographical or land survey, with spot heights across the site. New hard surfaces near trees need a topographical survey showing levels.
- Major developments: levels should be related to a site datum above Ordnance Datum (AOD).
None of these strictly says “commission a topographical survey” for a small extension, but a survey is by far the easiest way to produce accurate levels, and wherever a tree survey is needed it is effectively required.
What Wirral Council asks for
Wirral’s Local Validation Checklist (adopted May 2025) is more specific. It asks for section drawings and a site levels plan, showing existing and proposed ground levels and finished floor levels, for:
- any new building, or the replacement of a building;
- sites where the ground already varies by 1 metre or more;
- proposals that raise or lower the ground by 1 metre or more anywhere on the site;
- sites with a level difference of 1 metre or more to neighbouring land;
- smaller level changes, at the planning officer’s discretion.
The levels must be related to a fixed point outside the red line boundary that won’t change during the works, and Wirral says plainly that a topographic survey will be accepted as the existing site levels plan if it meets those requirements. Site plans must also state whether they were drawn from Ordnance Survey data or from a measured site survey.
Manchester and other councils
Every council publishes its own local validation list, and the details differ from one to the next. Manchester City Council, for example, publishes separate lists for each type of application. Before you submit, check the current list for your council and your type of application, or ask your architect. If you are unsure, a pre-application enquiry with the council will confirm what is needed.
When you might not need one
- Permitted development: if your extension does not need planning permission at all, there is no validation list to meet. Your builder will still need accurate levels to build it, which is where setting out comes in.
- Small extensions on flat ground: your architect may be able to show levels from measured drawings alone. On a sloping garden this rarely works well.
- Changes of use with no building work: levels are not usually relevant.
What to ask your surveyor for
If you do need a survey for planning, make sure it includes:
- levels tied to Ordnance Datum and the Ordnance Survey grid, with the survey control listed on the drawing;
- spot levels across the site and along the boundaries, and on neighbouring land where it can be seen;
- the floor level and door thresholds of the existing house;
- boundaries, walls and fences, with their heights;
- trees, with trunk positions and canopy spreads, ready for the tree surveyor;
- drainage covers and any visible services;
- neighbouring buildings and windows close to the boundary, where they can be seen from your site;
- the drawing in DWG for your architect, and PDF sheets with a scale bar and north point.
How much does it cost?
We price each topographical survey as one fixed figure: the time on site at our day rates plus the time to draw it up. Many residential plots need a half day on site, from £300 + VAT, with the drawing on top. See the typical topographical survey cost for each type of site, or send us the address and what the survey is for and we will give you a fixed price.
Common questions
Can I use an old topographical survey?
Often, if nothing on the site has changed and the survey is tied to Ordnance Datum. If there has been demolition, new walls or fences, tree work or any digging since, it should be updated, because the planners and your architect need the site as it is now.
Should I order the survey, or should my architect?
Either works. Many homeowners order the survey directly and pass it on, and we can send the DWG straight to your architect so they can start designing on it.
Sources
- Liverpool City Council: planning application forms and checklists (validation guidance and local information requirements, last updated October 2025)
- Wirral Council: planning application forms and checklists (Local Validation Checklist, adopted May 2025)
Checked October 2026. Council requirements change, so always check the current list before you submit.
Need a topographical survey for your planning application?
Send us the address and what the survey is for, and we’ll come back with a fixed price, usually the same day.